The Project
-
Review and report on existing detail to upgrade an
existing
wastewater treatment plant for 400 room hotel
-
Design surface drainage and waste water treatment
plant for
170 room block with possible future extension
-
Design wastewater and surface drainage
to tennis court
pavilion and parking areas
-
Design drainage to Eden Restaurant and surrounding
area
|