The
Project
-
Two new 5 storey room blocks, designed and precast
in
Barbados, shipped and erected on site in record time
-
New sea defence wall and boulder revetments, original
destroyed by Hurricane
-
Refurbishment of existing resort hotel blocks
-
Wastewater analysis and report recommendations for
new
wastewater treatment plant with recycling of treated
effluent for irrigation.
-
New tennis courts, water storage tank.
-
Redesign and upgrade of existing site drainage
Services;
-
Civil and structural design of insitu and precast
structures
-
Sea wall and sea protection structures
-
Offsite and site surface water drainage
-
Wastewater collection, treatment and disposal systems.
-
Infrastructure services
-
Supervision of construction works |